Production Update – Fit out 2

Exterior: Targa roof had recently been installed together with saloon side windows. We will also install Flexiteek, Lewmar winches, steering tillers, BBQ and solar panels as next steps.

Interior: Currently we are putting the sprayed furniture back in. Antifoul preparation is done, as well as plumbing, electric is done by 90%. We are also starting to work on flooring within next week.

Engineering: Engines and fuel systems are completed.