Your boat is doing well half-way through the fit out 2 stage.
So far, we have done with antifoul preparation, all deck gear, all hatches and windows, galley benchtops, diesel hot water, and heating system installation. Plumbing, steering, watermaker, and companionway flooring are also completed.
Currently, we are installing dual helm throttles, and have started detailing work in some areas.