Production update – Fit out

The current status shows that your boat is progressing well in Fitout 2 stage.

The boat has recently been equipped with some critical components, bringing it closer to the Detailing & QA stage. At this point, the glass and deck-gear installations have been completed. Our team has also installed the fuel system and bilge system.

We are now working on electrical cabling and the fresh-water system, and the black-water system installation has reached 80% completion.