Your boat has been moved to the new stage after assembly – fitting out.
Most of the work on the boat had been completed including the trampoline flange, chainplates, and bathroom sinks.
Currently, we are doing on thru-hulls, cockpit drains, bulkhead Laminex panels, and installing composite deck hatches.