Production Update – Fit out

Your boat has been moved to the new stage after assembly – fitting out.

We have also started drilling holes through the hull in preparation for the through hull fitting. The window frames have also been trimmed to the correct profile to prepare for glazing.

Currently, the mast is painted and longeron assembled, and the helm stations are being painted.