Your boat has just entered the fit out stage.
At this point, we have done with antifouling, all deck gear installation, hardtop glass and all Lewmar hatches installation. Anchor system, interior flooring and plumbing have been in place. The forward deck beam and trampoline have been installed, and steering system has also been completed.
Currently, we are working on electric system (50% done) and timber outfitting.
Our production team is also working on a spare parts list for you at the moment.