Production Update – Fit out

Your boat has been moved to the new stage after assembly – fitting out.

Until now, we have done many takes that gradually bring the boat to the next stage such as hardtop roof installation, engine pods, and galley top.

Currently, we are working on trampoline flange and deck hatches. The Center console had been installed by May 29th.