Production Update – Fitout 2

We are back with the production update this month knowing that you have been curious about the progress of your boat in our factory these days.

As you have already known that we’re now working with a small team to follow all the Covid-19 restrictions. However, there has been quite some significant progress you can see in the pictures below.

Exterior: We have already done with detailing and polishing both port and starboard hull. Hull sides and saloon windows have also been installed. Helm seats are in place and under some more detailing works. We also have the main cabin door and trampoline fitted. Deck hardware, longeron, and hardtop have also been installed. The solar panels are dry-fitted on the hardtop and saloon roof at the moment. The mast and boom have been painted and ready for fitting equipment.

Interior: We have fitted Flexiteak flooring in both bathrooms and the upholstery team has cut the vinyl cockpit flooring. The wiring harness for both port and starboard hull has been completed. The air conditioner has also been installed. We’re now working on electrical wiring, galley and saloon settee, cabin and saloon headliner, and hot water system.