Production Update – Detailing & QA

Your boat has been progressing well in the Detailing & QA stage, where several additional components have been completed to bring it closer to the final stages.

At this point, the installation of the fuel and bilge systems has been completed. We are currently working on the grey water system (90%), freshwater system (70%), seawater system installation (90%), black water system (50%), and timberwork (35%). Meanwhile, the interior gelcoat repairs are ongoing.