Your boat has been progressing well in the Fit-out stage and was recently equipped with some critical components.
At this stage, our Team has completed the installation of the ceiling panel frames, as well as the fuel and seawater systems. In addition, the window installation has also been completed.
We are currently working on interior gelcoat repairs (70% complete), the electrical system (45% complete), timberwork installation (25% complete), the grey water system (95% complete), and the freshwater system (90% complete). Installation of the bilge system, black water system, and Webasto heating system is also underway.